- A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and Strip Packing like Resource Constraints,
B. Láng
Paper 92 from CCP: 94, ISBN 978-1-905088-41-6 (2010)
- A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows,
B. Láng
Paper 2 from CCP: 92, ISBN 978-1-905088-35-5 (2009)
- Structural Embrittlement Due to Rivited Joints - Evolution to a Macroscopic Model for Crash-Analysis,
L. Patronelli, B. Langrand, E. Deletombe, E. Markiewicz and P. Drazétic
Paper 1.12 from CCP: 67, ISBN 0-948749-69-5 (2000)